Skip to product information
1 of 5

Sarah Ashford Studio

US 4 Seasons FILLABLE Sewing and Quilting Project Planner PDF

US 4 Seasons FILLABLE Sewing and Quilting Project Planner PDF

Regular price £2.99 GBP
Regular price £4.99 GBP Sale price £2.99 GBP
Sale Sold out
Tax included. Shipping calculated at checkout.

 

Plan your next creative project with this fillable sewing and quilting project tracker.  Designed for quilters, patchworkers and sewing enthusiasts, this digital PDF allows you to type into the designated text fields and tick the checkboxes while keeping the original design fixed. 

Use it organise your sewing plans, record project information and keep track of your progress without needing to print every page.

WHAT'S INCLUDED

  • A digital file, fillable PDF of the Sewing and Quilting Project Planner
  • One page per season; Fall, Winter, Spring, Summer (4 pages in total)
  • Interactive text fields for entering project details 
  • Clickable checkboxes, where provided 
  • An inspiring quote and colour/color palette inspiration for each season
  • Key US dates relating to each season
  • A fixed-layout design that keeps the original artwork and layout in place
  • Instant digital delivery after purchase 

HOW TO USE YOUR FILLABLE PDF 

Download the file and open it in a compatible PDF reader.  Type into available fields, tick the relevant check boxes and save your completed document to your computer or tablet.

You can also print your tracker if you'd prefer to keep a paper copy in your sewing room. 

PLEASE NOTE: 

  • This is a digital download.  No physical product will be posted
  • This is the US version.  Please check the listed page size and specifications before purchasing
  • A UK version is also available
  • You can complete the provided fields, but you cannot freely redesign the page or move the original elements
  • Compatibility can vary between PDF apps and devices.  A compatible PDF reader is recommended
  • For personal use only.  Redistribution and resale are not permitted
View full details